New Cutting machine arrives at the factory.(2)

Publish Time: 2022-03-21     Origin: Site

Totally 11 containers, need 3days to unload them all. Need 45days to install the whole system.

Let's see a stronger YongHong in the near future.


© 2022 Zhejiang Yonghong New Material Co., Ltd.